Stage 1 of 5

We dig beside the foundation.
The ground beside the foundation is opened and prepared, planned around your yard and where the door should land.

Steel rebar goes in first.
Rebar goes into the walls and base before any concrete is poured.

Solid poured concrete, every step.
Wood forms for every step, then solid poured concrete walls and grooved, slip-resistant stairs.

Somewhere for water to go.
A floor drain at the bottom landing, then the door is installed.

Finished, railed and clean.
Aluminum railings and handrail fitted, site cleaned at handover.
It's the question we hear most. Rebar, solid poured concrete and a drain at the bottom landing give water somewhere to go. We check your yard and foundation at the site visit before we quote.






















